{"id":811,"date":"2025-12-23T14:27:12","date_gmt":"2025-12-23T11:27:12","guid":{"rendered":"https:\/\/alarab.com.sa\/?post_type=projects&#038;p=811"},"modified":"2025-12-23T14:27:12","modified_gmt":"2025-12-23T11:27:12","slug":"%d9%85%d8%b4%d8%b1%d9%88%d8%b9-%d8%aa%d9%86%d9%81%d9%8a%d8%b0-%d9%85%d8%af%d8%b1%d8%b3%d8%a9-%d8%ab%d8%a7%d9%86%d9%88%d9%8a%d8%a9-%d8%aa%d9%84%d9%8a%d8%ab-%d9%86%d9%85%d9%88%d8%b0%d8%ac-15-%d9%81","status":"publish","type":"projects","link":"https:\/\/alarab.com.sa\/en\/projects\/%d9%85%d8%b4%d8%b1%d9%88%d8%b9-%d8%aa%d9%86%d9%81%d9%8a%d8%b0-%d9%85%d8%af%d8%b1%d8%b3%d8%a9-%d8%ab%d8%a7%d9%86%d9%88%d9%8a%d8%a9-%d8%aa%d9%84%d9%8a%d8%ab-%d9%86%d9%85%d9%88%d8%b0%d8%ac-15-%d9%81\/","title":{"rendered":"Construction of Talleeth Secondary School \u2013 15-Classroom Model"},"content":{"rendered":"<p><strong>Project Owner:<\/strong> Ministry of Education<\/p>\n<p><strong>Main Contractor:<\/strong> Sharz Trading &amp; Contracting Co. Ltd.<\/p>\n<p><strong>Scope of Work:<\/strong> Execution of full construction works for the secondary school building based on the approved 15-classroom model, ensuring compliance with educational requirements, quality standards, and safety regulations.<\/p>","protected":false},"featured_media":812,"template":"","class_list":["post-811","projects","type-projects","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/alarab.com.sa\/en\/wp-json\/wp\/v2\/projects\/811","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alarab.com.sa\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/alarab.com.sa\/en\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alarab.com.sa\/en\/wp-json\/wp\/v2\/media\/812"}],"wp:attachment":[{"href":"https:\/\/alarab.com.sa\/en\/wp-json\/wp\/v2\/media?parent=811"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}