{"id":827,"date":"2025-12-23T15:49:00","date_gmt":"2025-12-23T12:49:00","guid":{"rendered":"https:\/\/alarab.com.sa\/?post_type=projects&#038;p=827"},"modified":"2025-12-23T15:49:12","modified_gmt":"2025-12-23T12:49:12","slug":"%d9%85%d8%b4%d8%b1%d9%88%d8%b9-%d8%a3%d8%b9%d9%85%d8%a7%d9%84-%d8%ae%d8%b1%d8%b3%d8%a7%d9%86%d9%8a%d8%a9-%d9%84%d9%85%d8%ad%d8%b7%d8%a7%d8%aa-%d8%ae%d8%b7-2-%d8%a8%d9%85%d8%aa%d8%b1%d9%88-%d8%a7%d9%84","status":"publish","type":"projects","link":"https:\/\/alarab.com.sa\/en\/projects\/%d9%85%d8%b4%d8%b1%d9%88%d8%b9-%d8%a3%d8%b9%d9%85%d8%a7%d9%84-%d8%ae%d8%b1%d8%b3%d8%a7%d9%86%d9%8a%d8%a9-%d9%84%d9%85%d8%ad%d8%b7%d8%a7%d8%aa-%d8%ae%d8%b7-2-%d8%a8%d9%85%d8%aa%d8%b1%d9%88-%d8%a7%d9%84\/","title":{"rendered":"Concrete Works for Line 2 Stations \u2013 Riyadh Metro Project"},"content":{"rendered":"<p><strong>Project Owner:<\/strong> General Authority for Riyadh Development<\/p>\n<p><strong>Main Contractor:<\/strong> Al Arel Contracting &amp; Industrial Company Ltd.<\/p>\n<p><strong>Scope of Work:<\/strong> Execution of concrete works for metro stations within Line 2, in accordance with approved technical requirements and standards for public transportation and infrastructure projects.<\/p>","protected":false},"featured_media":830,"template":"","class_list":["post-827","projects","type-projects","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/alarab.com.sa\/en\/wp-json\/wp\/v2\/projects\/827","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alarab.com.sa\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/alarab.com.sa\/en\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alarab.com.sa\/en\/wp-json\/wp\/v2\/media\/830"}],"wp:attachment":[{"href":"https:\/\/alarab.com.sa\/en\/wp-json\/wp\/v2\/media?parent=827"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}